A scope of work is the written description of exactly what a job includes and what it excludes: the tasks, materials, quantities, locations and standards of finish. It's the part of an estimate or contract that defines what the price buys, so anything outside it needs a change order.
Also called: SOW, Job scope, Work description
The price on an estimate means nothing without the scope next to it. "Replace roof, $14,000" leaves the customer to imagine what's included, and they'll imagine more than you priced. A clear scope is what lets you say "that wasn't in the job" without starting an argument, and what lets another crew show up and do the work without calling you.
Customers are told to look for it. The FTC tells homeowners that a written estimate should describe the work, the materials, the completion date and the price 1. Some states put scope requirements into law. Massachusetts, for example, requires home improvement contracts over $1,000 to be in writing, with a detailed description of the work and the materials to be used and the start and completion dates 2. Rules differ by state, so check with your state's licensing board or attorney general's office.
Example: A vague scope reads "Install new bathroom fan, $450." A clear one reads: "Remove existing fan. Install one 80 CFM fan with humidity sensor in the same ceiling opening, ducted through the existing roof cap. Connect to the existing switch. Excludes drywall repair beyond the fan opening and any roof work. Assumes the existing duct is intact; if it isn't, we'll stop and get written approval before replacing it." When the duct turns out to be crushed, the second version makes the fix a simple change order instead of an argument. The numbers are made up for illustration.
The scope is the baseline everything else is measured against. A change order amends it, a punch list checks the finished work against it, and good-better-best pricing gives each option its own scope. When you're the one pricing a scope someone else wrote, as on a bid, read it line by line and price exactly what it says. How to handle change orders covers what to do when the work moves outside it.
Rules and figures change, and many requirements vary by state and city. Check the current version of each source and your local authority before acting, and talk to a licensed professional about your specific situation.