A building permit is written approval from the local building department to do regulated construction, plumbing, electrical or mechanical work. It comes with inspections at set stages, and the job isn't finished until the inspector signs off on the final.
Also called: Permit, Construction permit
The answer comes from whatever code your city, county or state has adopted, along with its local amendments, so the building department that will inspect the job is the only reliable source. The International Residential Code shows how broad the rule usually is. Its model text says anyone who intends to build, alter, repair, move or demolish a home, or to install, alter, repair or replace an electrical, gas, mechanical or plumbing system the code regulates, must first apply to the building official and get the permit 1.
The same code lists work that's exempt, such as painting, tiling, carpeting, cabinets and similar finish work, and fences up to a set height. It also says an exemption never authorizes work that breaks the code 2. Local lists differ, so a water heater swap, a re-roof or a panel change can need a permit in one town and not the next.
A permit isn't a one-time fee. Under the model code it's the permit holder's job to tell the building official when work is ready for inspection, rough plumbing, mechanical, gas and electrical work is inspected before it's covered, and work can't continue past an inspection point until it's approved 3. Every inspection is a date on your schedule and a possible return trip, so build them into the timeline and the price.
On a contractor job, you should. The FTC lists a contractor asking the homeowner to get the required building permits among the signs of a home improvement scam 4. Some jurisdictions also tie permits to a license or local registration, so check with the building department before you take work in a new town.
Example: A plumber quotes a water heater replacement as one line: "Install new 50-gallon gas water heater, $2,400." The town requires a permit. A clearer quote adds "Permit and inspection: we pull the permit, schedule the inspection and meet the inspector. Fee included: $95." The price is made up, but the customer now knows who handles the permit and that the job closes when it passes.
An inspector can require changes the estimate didn't include. Handle those with a written change order, and define what's in and out in the scope of work. Electrical work is inspected against the edition of the National Electrical Code your area adopted, and solar adds the utility's permission to operate after the final.
Rules and figures change, and many requirements vary by state and city. Check the current version of each source and your local authority before acting, and talk to a licensed professional about your specific situation.